SOP & Station Layout
The first principle of speed is one fewer step and one fewer decision. Here is a copy-and-paste SOP, station layouts and zero-cost organisation.
The ideal 9-step sequence
Standard motions from scan to staging, and which steps can be batched — and which never can.
Read →StationU / L / straight-line layouts
Which layout fits your volume and product, and how to make the flow a one-way river.
Read →Zero costThe 60cm reach zone & 5S
Bring every supply into reach for ~15–25% more speed with no capital spend.
Read →DiagnosticHow to time one order
Split the time into four buckets; the biggest one is your real problem.
Read →The three principles that matter most
Remove walking before anything else
Every trip costs 15–40 s; discipline won’t fix it — layout will.
Turn decisions into lookups
Converge to 3–4 boxes with a written rule; pre-cut fill; cut on-the-spot judgement.
Batch by task
Repeat one step across the batch; never batch the address check.
Keep four quality checks
Address, shake test, item check, payment confirmation — always.
Industry benchmarks: orders per hour by product type
Use these to tell whether you are at beginner, competent or expert level, and to set a target. Packing-only reference ranges: single-item and multi-item bands are published; fragile and heavy rows are estimates (see note).
| Order type | Beginner | Competent | Expert |
|---|---|---|---|
| Single-item, uniform | 20–30 | 40–60 | 60–80 |
| Multi-item, mixed | 10–20 | 25–40 | 40–55 |
| Fragile (double-box)* | 8–15 | 15–25 | 25–35 |
| Heavy / oversized (>30 lb)* | 5–10 | 10–18 | 18–25 |
Note: * Fragile and heavy rows are extrapolated experience bands (no direct published figure). Single-item and multi-item rows come from published industry benchmarks (e.g. Nventory: 40–60 single-item and 25–40 multi-item; CXTMS: ~30–80 packs/hour). Full sources & method →
Apply these principles to your process
The optimizer sequences your steps and costs them automatically.